Custom Injection Molding Company | Plastic Injection Moulding Services | Mulan Manufacturing Group                                                                                                 Contact@china-plasticparts.com

Language

What should be paid attention to before using blow molding equipment?

2023/04/21

Author: MULAN -Plastic Molding Manufacturer

Do you know what to pay attention to before using blow molding equipment? The following editor will explain 1. Before using the blow molding equipment, you must read the instruction manual of the injection molding machine used in detail, understand the structure, transmission and action process of your machine, understand the use of various control components and components, and be familiar with the oil circuit diagram and electrical principles. 2. Check the fastening condition of each fastening part in detail. If there is looseness, it should be tightened immediately. 3. Check whether the buttons, electrical switches, operating handles, handwheels, etc. are damaged or malfunctioning. Before driving, each switch handle or button should be in the disconnected position. 4. Check whether the safety door slides flexibly on the track, and whether the limit switch can be touched at the set position. 5. Check whether the oil tank of the blow molding product equipment is full of hydraulic oil. If it is not filled, the oil tank should be cleaned first, and then the hydraulic oil of the specified type should be injected into the tank from the oil filter, and the oil level should reach the upper and lower limit lines of the gauge. middle. 6. Pour lubricating oil into all oil cups and lubricating channels to make them lubricated. 7. Check whether the power supply voltage is consistent with the rated voltage of the electrical equipment, if not, adjust accordingly to make the two the same. 8. Check the cleanliness of the second working surface of the machine, remove all kinds of tools and sundries used in equipment debugging, especially the transmission part and sliding part must be clean. 9. Check whether there is any foreign matter in the hopper of the blow molding product equipment, and fill the hopper with materials.

CONTACT US
Just tell us your requirements, we can do more than you can imagine.
Attachment:
    Send your inquiry

    Send your inquiry

    Attachment:
      Choose a different language
      English
      русский
      Português
      italiano
      français
      Español
      Deutsch
      العربية
      Current language:English