Custom Injection Molding Company | Plastic Injection Moulding Services | Mulan Manufacturing Group Contact@china-plasticparts.com
Author: MULAN -Plastic Molding Manufacturer
1. After the machining center is powered on, immediately check whether the switch buttons and indicator lights are normal. If there is any abnormality, immediately shut down and report to the maintenance... 2. Before formal machining, the coordinates of the machining center should be returned to zero, and the machine should be idling for 15 minutes It can be officially operated after more than a second. 3. In order to simplify the positioning and installation of the cnc machining center, each positioning surface has a relative processing origin, and all have precise coordinate dimensions... 4. When installing, ensure that the stroke of the workpiece to be processed is within the stroke range of the spindle. 5. When installing the workpiece, ensure that the workpiece is installed tightly, but also be careful not to be too tight and cause loss of positioning accuracy.